The lorry is coming. Is the site ready?

By Krewsite5 min

Prepare material deliveries with clear access, arrival slots, unloading, storage and discrepancy checks. Includes a practical site delivery checklist.

The supplier announces a delivery for tomorrow. On site, the entrance is occupied, nobody has been assigned to meet the driver and the storage location has not been chosen. The team has to reorganise its morning.

A material delivery to a construction site should be prepared as soon as the order and work constraints are known. Connect the team’s needs, the supplier’s slot, access restrictions and unloading arrangements.

Adapt this organisational checklist to the site. Competent people must determine safe working conditions and suitable handling equipment under the rules applicable to the operation.

Key takeaways

  • Check expected references and quantities before confirming the slot.
  • Confirm access, unloading arrangements and storage.
  • Assign someone to receive the delivery and deal with discrepancies.
  • Tell the installation team what is actually available.

Start with when the materials are needed

Link every delivery to an intervention in the construction programme. Record the required date, zone and consequences of a delay.

An announced delivery does not mean the materials are ready to install. Their arrival must still be confirmed, the required checks completed and the materials made available in the right place.

Agree a confirmation point with the supplier. Distinguish the requested date, announced date and confirmed slot so the team understands what remains uncertain.

Checklist before the lorry arrives

PointCheck
OrderExpected references, descriptions, quantities and packaging
Arrival slotConfirmed date, time window and supplier contact
AddressExact entrance, meeting point and instructions shared
AccessVehicle constraints reviewed and traffic coordinated
ReceptionNamed, reachable person familiar with the order
UnloadingResponsibilities, suitable equipment and personnel arranged
StorageIdentified space, available and suitable for the materials
CoordinationOther teams informed of temporary restrictions
DocumentsOrder and delivery note available for checking
DiscrepanciesKnown contact and reporting procedure

Resolve missing points before final confirmation. If the site cannot receive the delivery, coordinate an alternative with the responsible people and supplier.

Decide where materials will be placed

An available space may not be suitable for storage. Have its suitability checked against the materials, site conditions and manufacturer’s storage instructions.

Mark the zone on a drawing or annotated photo. Coordinate it with access routes and upcoming works. If a later transfer is needed, assign it and arrange appropriate equipment.

This also helps avoid unnecessary movements. Leaving materials in a temporary location without planning the next step creates another task for the installation team.

Check arrivals and report discrepancies

Compare what arrives with the order and delivery note under the agreed checking procedure. Describe observable differences: incorrect reference, missing quantity, damaged packaging or absent item.

Record the facts precisely and send them to the designated contact. Photos can support the record; include the delivery reference and zone. The site photo guide explains how to organise them.

Follow the contractual procedures and deadlines for reservations and claims. An internal note or photo does not replace the required notification to the carrier or supplier.

Example supply tracking sheet

Illustrative example: a team needs to install equipment in zone A on Thursday morning. The supplier announces a Wednesday delivery. These are the outstanding checks.

InformationTracking status
NeedEquipment listed in the order, zone A, Thursday morning
DeliveryWednesday announced; time slot to confirm
ReceptionResponsible person assigned; details shared with supplier
StorageZone identified; availability to check on Tuesday
UnloadingArrangements to confirm with the relevant people
Decision pointCheck confirmations on Tuesday before final scheduling

This sheet makes uncertainty visible. When the materials arrive, update received quantities, discrepancies and follow-up actions.

Tell the team what it can use

After checking the delivery, state where the materials are and which references are available. If something is missing or awaiting a decision, explain what can be scheduled and what remains on hold.

Include this information in the handover sheet when teams change. “Delivery arrived” is less useful than “zone A references present; zone B accessories missing, supplier response pending”.

Frequently asked questions

When should a material delivery be confirmed?

Once the need, slot, access, reception, unloading and storage have been coordinated. Agree with the supplier when the final information needs to be exchanged.

What if the supplier announces a delay?

Identify affected interventions, request a new date and have the programme reviewed. Inform the teams and record the decisions.

Where should delivery notes be kept?

In the project folder, with a reference linking the order, date and any discrepancies. Check that the people responsible for follow-up and invoicing can access them.

Built for construction teams

Start with one project. Keep your team informed.

  • WhatsApp on site
  • A clear view at the office
  • Track each project

Your next project
starts here.