← Back to blog
Site monitoring

Plan the connection between your site software and ERP

By Krewsite5 min

Plan which construction data to exchange with your ERP, understand connector and webhook limits, and prepare a controlled first synchronisation.

Your business already uses management software for clients, quotes or invoices. Field teams record hours, reports and issues. Connecting those workflows can reduce retyping, provided you define exactly which information needs to move.

This guide describes Krewsite's planned connections and what to check before linking project tracking to a construction ERP. External integrations are not currently available. They will open gradually; check the integration catalogue before planning a rollout.

Key takeaways

  • A connector has a specific scope. Connecting two tools does not synchronise all their data.
  • Planned PROgBAT and Costructor workflows cover linked projects and validated hours; PDF transfers to PROgBox relate to PROgBAT.
  • The planned Sage Active connection concerns clients, not every Sage product.
  • ExtraBat, Graneet and Kalitics are also among the planned connections. Check their status on the Integrations page.
  • A webhook sends an event to a receiving tool. Processing on that side still needs configuration.

Define the data you need before connecting an ERP

Start with a concrete question: which repeated entry do you want to reduce? Hours for administration, reports to file and project lists require different connections.

Identify who approves the information. A field time entry may need checking before export. A report needs review before transfer. A connector moves data; your organisation remains responsible for approval.

Connections planned for Krewsite

The following sections describe intended scope. They are not a statement of current availability or a launch date.

PROgBAT: projects, validated hours and PDF reports

The planned connection links projects between Krewsite and PROgBAT and supports sending validated hours. Sending PDFs to PROgBox requires a destination folder and the corresponding access permissions.

Check project and worker mappings before the first export. Do not assume that records created before connection will be transferred automatically.

Costructor: projects and validated hours

The planned connection uses a Costructor API key. Projects and workers must be matched before enabling supported exchanges. Hour transfers concern approved time records when that option is enabled.

Sage Active: clients

The planned Sage Active scope covers clients: selecting a Sage company, viewing its clients and explicitly creating clients when needed. The client name can then be used in the Krewsite project record.

This scope concerns Sage Active. It does not imply identical compatibility with every Sage product or exports of time entries and invoices.

Google and other planned connections

The intended Google Drive workflow saves PDFs to a configured folder. Google Calendar concerns event imports; displaying those events in the schedule is being prepared. Direct connections to Microsoft Outlook, SharePoint, ExtraBat, Graneet and Kalitics are also planned.

The integration catalogue lists each tool's status and scope. None of these external connections is currently open.

What does a webhook do?

A webhook sends data when an event occurs, such as a time entry, completed report or issue. In the planned workflow, Krewsite sends the event to a configured address. A receiving service, or a tool such as Make, Zapier or n8n, must understand the format and perform the required action.

An HMAC-SHA256 signature lets the receiver verify origin and integrity by checking it with the agreed secret. It does not replace access controls or validation of incoming data.

Prepare a first exchange when the connector opens

  1. Choose a limited workflow, such as approved hours for one project.
  2. Authorise the connection in Krewsite settings with the tool's required permissions, once available.
  3. Match the data: projects, workers and document destinations where needed.
  4. Check the first transfer in both systems, including dates, people, project and values.
  5. Expand gradually once the people using the data have confirmed the result.

Plan for corrections and exceptions

An hour changed after export may need correction in the ERP. An updated report may not replace a PDF already sent. Agree who checks differences, and confirm receipt before repeating an uncertain export.

Also define which record takes precedence if two versions conflict and who can decide. This preparation helps avoid duplicates and unexpected changes.

Frequently asked questions

Can Krewsite work without an ERP? Yes. Project, report and team tracking work in Krewsite independently. Integrations address a need to exchange information with another tool.

Can a tool outside the catalogue be connected? That depends on its API or import capabilities. Planned Krewsite webhooks provide a basis for discussing a custom exchange with your integrator, once available.

How long should implementation take? Timing depends on permissions, data mappings and changes needed at the destination. Start with a limited test after the connector opens before committing to a rollout schedule.

Will all data be synchronised? No. Each connector has its own objects, transfer directions and conditions. Check that scope before replacing an existing process.

Choose the next useful exchange

Start with a specific repeated entry and assess how a connection would change the team's work. Meanwhile, you can organise time tracking, daily reports and project documents within Krewsite.

Built for construction teams

Start with one project. Keep your team informed.

  • WhatsApp on site
  • A clear view at the office
  • Track each project

Your next project
starts here.