Site monitoring

Know what happened on site—and what needs to happen next

By Krewsite6 min

Build a reliable daily site routine: track attendance, progress, photos and blockers, then choose software that fits your construction team.

The construction manager is preparing tomorrow's work. A timesheet is missing, a photo is needed before a partition is closed, and nobody has confirmed whether the next zone is ready. The answers exist, spread across three phone calls.

Construction site tracking brings those facts together so you can decide what happens next. This guide covers a daily routine, a worked example and the checks to make when choosing software.

Key takeaways

  • Agree which information the office needs and who will submit it.
  • Keep planned assignments, recorded attendance and observed progress distinct.
  • Link reports, photos and issues to the right project.
  • Test a complete field-to-office workflow before rolling it out.

Which information should you collect?

Start with the decisions the office needs to make. Collecting more fields is useful only when someone uses them.

InformationField entryOffice check
AttendancePerson, project and timesMissing entries, site changes and corrections
ProgressWork item, zone and quantity completedDifference from the planned work
BlockerObservation, location and effectRequired action and person to contact
PhotosDated, located images with captionsFiling in the relevant report or project record
DocumentsReference and version usedWhether a newer version must be shared

Choose location references that suit the project. Rooms may work for a renovation; sections may work for roads or utility works. Use the same names in reports, photos and instructions.

A routine for each working day

Before work starts

Confirm the project, zone and work planned for each team. Check access, materials and the current drawings. Identify any prerequisite that the next team depends on: a clear work area, a completed check or a delivery.

During the day

Report a blocker while there is still time to act. State what happened, where it happened and what decision is needed. A photo can help locate the issue. An urgent issue report and the end-of-day report serve different purposes; one should not delay the other.

Before the team leaves

Have the nominated person complete the daily report. The office checks missing information and prepares the next instructions. Keep detailed hours in the time-tracking record, linked to the same project.

Example: preparing the next stage of a renovation

This fictional example shows how a short record can support the following day's decisions.

ObservationNext action
First-floor partition frames completed in rooms A and BSchedule the services work in the available areas
A delivery blocks access to room CConfirm when access will be cleared
Photos taken of services in room AFile them before the partition is closed
One worker moved to another site at middayCheck the allocation of recorded hours
A revised drawing reached the officeConfirm that the team has the current version

Give each action an owner. “To be checked” does not say who will make the next decision. For a change of team, use the site handover template.

How to evaluate construction tracking software

Test a real working day: create a project, record hours, submit a photo and report, then find everything from the office.

AreaWhat to test
Time trackingA forgotten entry, a correction and a day split between two sites
ReportsA template adapted to your trade and a submitted report you can retrieve
Photos and documentsLocation, version and access to the right project record
PermissionsWhat a team member, site manager and office user can see
Planned versus actualHow assignments differ from attendance and completed work
ExportsThe format and detail available for your next administrative step

Compare recorded hours with the labour budget, progress and remaining work. Hours alone do not explain whether a project is on track. Our guide to planned and actual hours provides a review method.

Check the limits of a free plan

Look at active projects, users, storage, included features and exports. Test with a representative team: a plan that suits one user may not cover the people who need to submit and review information.

Connecting the field and office with Krewsite

Krewsite provides guided WhatsApp workflows for time entries, reports and issues. The field team selects a project and supplies the requested information; the office reviews the submissions in the web dashboard.

Compare the plans and their limits, then create a trial workspace to test the workflow for 15 days, with no card required and no automatic charge. The web application is available in French and English.

Frequently asked questions

What is the difference between site tracking and project management?

Tracking records what happened and what remains open. Project management uses that information to organise resources, costs, sequencing and decisions. Both depend on a shared understanding of the facts.

Do you need software for one project?

A shared folder and a clear reporting routine may be sufficient. Software becomes useful when retyping information, coordinating teams or finding records takes too much work. Test it against those specific difficulties.

How should you start?

Choose a pilot project, a short report template and a named office reviewer. Add fields when a real decision requires missing information, then extend the routine to other projects.