A photo arrives in the WhatsApp group, followed by a voice message about blocked access. At the office, someone still has to identify the zone, attach the information to the project and notify the next team.
To use WhatsApp for construction site tracking, define what people should submit and where it belongs. Krewsite offers guided workflows that connect field entries to the office dashboard.
Key takeaways
- Link each submission to an identified project.
- Use a template for reports and issues.
- Check the saving confirmation after submitting information.
- Make someone at the office responsible for review and follow-up.
What a site conversation already does well
If your team uses WhatsApp, it already has a way to share photos, voice messages and documents. These exchanges help answer a specific question or communicate an observation.
The difficulty comes when projects, zones and teams overlap across conversations. Office users need to find information without remembering who sent each message. A common structure helps turn an exchange into an action that can be followed up.
| Information sent | Detail to include | Useful destination |
|---|---|---|
| Photo of work | Project, zone and stage | Report or photo record |
| Blocker | Effect and decision needed | Issue tracking |
| Progress | Completed and remaining work | Daily report |
| Time entry | Person and project | Attendance record for review |
| Instruction | Recipient and relevant job | Instruction history |
For a photo-filing method, see our guide to organising site photos.
How does a guided Krewsite workflow work?
The company sets up projects and access. Team members open their Krewsite conversation in WhatsApp, choose an action and complete the requested fields. Submissions are attached to the selected project.
Record arrivals and departures
The site time-tracking workflow lets a worker select a project and record an arrival or departure. When GPS checking is enabled, location is used for that entry. The office reviews hours and necessary corrections before using them.
Complete a report with photos
The team selects a template and fills in its sections. Form fields structure the observations; photos illustrate completed work or points to check. Our daily report guide includes a completed example.
Voice input can help prepare text, depending on the features included in the plan. Review the result before submitting it: zone names, quantities and material references need particular care.
Locate an issue
Specify the zone, observed facts and priority. Add a photo when it helps explain the situation. In the office, issue tracking helps staff retrieve the report and its associated actions.
Check that the submission was saved
A connection is required to send information. After a network interruption, check the saving confirmation before treating a time entry or report as received.
What should the office review?
The dashboard groups information by project. Plan a review suited to your organisation: incomplete reports, hours to correct, issues needing a response or documents to share.
| Office check | Next action |
|---|---|
| Was the correct project selected? | Correct the allocation through the available workflow |
| Does the report identify a precise zone? | Request the missing detail |
| Are the hours consistent? | Check forgotten entries and changes of site |
| Does an issue block the next job? | Name the person who will make the decision |
Receiving a message does not replace this review. Define who handles open points and how the team learns what happens next.
WhatsApp or a dedicated application: what should you test?
Compare tools against daily work. An application already used by your team may suit it well. A WhatsApp workflow may help when the channel is familiar and the forms cover your needs.
- Choose a representative project and the people who will take part in the trial.
- Prepare access, templates and zone references.
- Submit a time entry, a report and a clearly labelled fictional issue.
- Find the records at the office and check viewing permissions.
- Move to a real working day, then record difficulties before extending use.
When another team takes over, use the site handover template.
Frequently asked questions
Does the field team need to install a Krewsite application?
The field workflow described here uses WhatsApp. The company prepares and authorises access; office staff use the web dashboard. The web application is available in French and English.
Is a WhatsApp discussion enough to archive a project?
You also need to define filing, permissions and retention. In a group conversation, nominate someone to attach documents to the project record. With a guided workflow, check the selected project and confirmation that the submission was saved.
Can tracking connect to an ERP?
The scope depends on the connector and its availability. Check the Integrations page and ERP integration guide before planning any synchronisation. External connectors are currently planned, rather than available.
Prepare your workflow with Krewsite
Start with the information the office requests most often. Explore report completion through WhatsApp, then compare the plans and included features.
Create your trial workspace to test the workflow for 15 days, with no payment card and no automatic charge.
